www.robowars.org

RoboWars Australia Forum Index -> State Specific Information

QLD Arenas
Goto page Previous  1, 2, 3 ... 32, 33, 34, 35  Next

Post new topic   Reply to topic
  Author    Thread
Valen
Experienced Roboteer


Joined: 07 Jul 2004
Posts: 4436
Location: Sydney


 Reply with quote  

only difference with PWM is there is no inductance in the output so it'll be full current then no current. Shouldn't cause issues I guess as full current will be within spec for the power supply, but with Chinese stuff I'd be worried about things like exceeding the ripple current of its caps.

I'd avoid it close to the event TBH, just go on/off control if you are feeling fancy, otherwise a power switch works ;->
_________________
Mechanical engineers build weapons, civil engineers build targets

Post Tue Sep 08, 2015 11:46 am 
 View user's profile Send private message Visit poster's website AIM Address Yahoo Messenger MSN Messenger ICQ Number
Nick
Experienced Roboteer


Joined: 16 Jun 2004
Posts: 11802
Location: Sydney, NSW


 Reply with quote  

The first light is complete, with the extra heatsink channels on the back:



After about 20 minutes, the heatsink is at 38 Deg, which is 20 Deg. over ambient - a WAY better result!

The next three lights will have the heatsinks positioned closer together and right behind the LED strips for better cooling. Unfortunately, Edcon only had enough aluminium to make two lights so its going to take most of the week to get all four lights finished Sad.
_________________
Australian 2015 Featherweight champion
UK 2016 Gladiator champion

Post Mon Sep 14, 2015 12:54 am 
 View user's profile Send private message
miles&Jules
Experienced Roboteer


Joined: 19 May 2010
Posts: 3973
Location: ipswich QLD


 Reply with quote  

looks pro nick..cant wait to see em in the arena Very Happy
_________________
Miles Blow - Julie Pitts
www.mulesfilm.com.au
www.wombokforest.com.au

-Pickasso- Vivid Sportsman champion 2015

Post Mon Sep 14, 2015 2:29 pm 
 View user's profile Send private message Send e-mail Visit poster's website
marto
Experienced Roboteer


Joined: 08 Jul 2004
Posts: 5459
Location: Brisbane, QLD


 Reply with quote  

Can anyone in QLD pickup and paint new floor for arena. I am not going to have time before nats and the main sheets are pretty wrecked.

Steve
_________________
Steven Martin
Twisted Constructions
http://www.botbitz.com

Post Wed Sep 16, 2015 5:39 pm 
 View user's profile Send private message Send e-mail MSN Messenger
miles&Jules
Experienced Roboteer


Joined: 19 May 2010
Posts: 3973
Location: ipswich QLD


 Reply with quote  

yep we can do that
_________________
Miles Blow - Julie Pitts
www.mulesfilm.com.au
www.wombokforest.com.au

-Pickasso- Vivid Sportsman champion 2015

Post Wed Sep 16, 2015 10:36 pm 
 View user's profile Send private message Send e-mail Visit poster's website
miles&Jules
Experienced Roboteer


Joined: 19 May 2010
Posts: 3973
Location: ipswich QLD


 Reply with quote  

whats he plan for the extractor…do we just chuck it in the arena on the floor if there is a liopo smoke incident?
_________________
Miles Blow - Julie Pitts
www.mulesfilm.com.au
www.wombokforest.com.au

-Pickasso- Vivid Sportsman champion 2015

Post Wed Sep 16, 2015 10:37 pm 
 View user's profile Send private message Send e-mail Visit poster's website
marto
Experienced Roboteer


Joined: 08 Jul 2004
Posts: 5459
Location: Brisbane, QLD


 Reply with quote  

Um TBH I haven't even worked out how it works. I would just leave it nearby and put it in if we have a fire to try and consume the smoke.

For the floor we need 8 x 16mm MDF panels painted for the inside. I think we can keep the 20mm ones for the underlay. They will do as is. We have enough cash in the club funds for this.

Steve
_________________
Steven Martin
Twisted Constructions
http://www.botbitz.com

Post Thu Sep 17, 2015 9:07 am 
 View user's profile Send private message Send e-mail MSN Messenger
miles&Jules
Experienced Roboteer


Joined: 19 May 2010
Posts: 3973
Location: ipswich QLD


 Reply with quote  

Righto will grab em in the next week or so…will ask Andrew K for cash.
_________________
Miles Blow - Julie Pitts
www.mulesfilm.com.au
www.wombokforest.com.au

-Pickasso- Vivid Sportsman champion 2015

Post Fri Sep 18, 2015 12:02 am 
 View user's profile Send private message Send e-mail Visit poster's website
marto
Experienced Roboteer


Joined: 08 Jul 2004
Posts: 5459
Location: Brisbane, QLD


 Reply with quote  

I am also thinking this year might is probably the last we can use if for full combat. With the ever increasing power of spinners I just don't think its strong enough.

Not sure of the upgrade path but something to keep in mind for next years nationals.

Steve
_________________
Steven Martin
Twisted Constructions
http://www.botbitz.com

Post Sat Sep 19, 2015 3:36 pm 
 View user's profile Send private message Send e-mail MSN Messenger
Nick
Experienced Roboteer


Joined: 16 Jun 2004
Posts: 11802
Location: Sydney, NSW


 Reply with quote  

A new door would be really nice but we can probably just replace the steel base panels with thicker steel, possibly upgrade it with Bisalloy. Making the panels a bit higher wouldn't hurt either.

We already talked about stopping the arena walls bowing out, how about just drilling holes in the baseplates and screwing them down to the underlay MDF sheets? A bunch of short 12 gauge screws will stop everything moving and its cheap & easy.
_________________
Australian 2015 Featherweight champion
UK 2016 Gladiator champion

Post Sat Sep 19, 2015 4:30 pm 
 View user's profile Send private message
marto
Experienced Roboteer


Joined: 08 Jul 2004
Posts: 5459
Location: Brisbane, QLD


 Reply with quote  

A bunch 20mm screws should do it. 8 holes in each one of those beams. 6mm steel, 96 holes well there goes my next sunday. Last time we tried this though we just sheared off the screws.

I think adding some ablative MDF to the inside of the 3mm would be the easiest fix. Even a 10mm sheet would be a massive improvement. My biggest concern is the 6mm poly it needs at least another 3mm on the outside.

Also next time we setup the arena I don't think we should put in the floor until the walls are up and tightened. Seems to cause more issues. But we will need to make sure that we set it up as square as we can.

Steve
_________________
Steven Martin
Twisted Constructions
http://www.botbitz.com

Post Sat Sep 19, 2015 5:25 pm 
 View user's profile Send private message Send e-mail MSN Messenger
miles&Jules
Experienced Roboteer


Joined: 19 May 2010
Posts: 3973
Location: ipswich QLD


 Reply with quote  

i thought the poly might need to be thicker. Uk have half inch poly right? No spinner has actually pierced the steel plate yet…and we do have the mdf cover edge if a spinner did.
_________________
Miles Blow - Julie Pitts
www.mulesfilm.com.au
www.wombokforest.com.au

-Pickasso- Vivid Sportsman champion 2015

Post Sun Sep 20, 2015 9:06 am 
 View user's profile Send private message Send e-mail Visit poster's website
marto
Experienced Roboteer


Joined: 08 Jul 2004
Posts: 5459
Location: Brisbane, QLD


 Reply with quote  

It also has the extra 6mm of steel.

But I think an extra layer of polycarb or thicker poly is next big step.

Steve
_________________
Steven Martin
Twisted Constructions
http://www.botbitz.com

Post Sun Sep 20, 2015 9:57 am 
 View user's profile Send private message Send e-mail MSN Messenger
RogueTwoRobots



Joined: 12 Jan 2008
Posts: 135
Location: Irvine, Scotland


 Reply with quote  

The UK Robo Challenge arena used at the champs is 10mm poly walls and 5mm poly roof, with the moat/flip out zone to offer a little protection to the polycarb.

The arena took an absolute pounding this year though. The polycarb thicknesses have been the same since 2007, but I don't know with the constantly increasing power of spinners whether that's something that'll need to be reviewed soon.
_________________
Jamie
RogueTwo Robots
www.rogue-two-robots.vze.com

With great power, comes great reliability

Post Tue Sep 22, 2015 3:34 am 
 View user's profile Send private message MSN Messenger
marto
Experienced Roboteer


Joined: 08 Jul 2004
Posts: 5459
Location: Brisbane, QLD


 Reply with quote  

I think 2 separated layers would be better than one thicker internal layer. My concern is not really projectiles breaching the polycarb its a robot flying into it and a direct hit cutting though the layer.

I which case an air gap is going to be much better than solid poly I don't think glen would have much of a problem cutting through any thickness of polycarb. But with an air gap it would be very difficult to get sufficient penetration (while wheels are off the ground) to do so.

Very hard to test these theories.
_________________
Steven Martin
Twisted Constructions
http://www.botbitz.com

Post Tue Sep 22, 2015 12:04 pm 
 View user's profile Send private message Send e-mail MSN Messenger
  Display posts from previous:      

Forum Jump:
Jump to:  

Post new topic   Reply to topic
Page 33 of 35

Goto page Previous  1, 2, 3 ... 32, 33, 34, 35  Next

Forum Rules:
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum

 

Last Thread | Next Thread  >
Powered by phpBB: © 2001 phpBB Group
millenniumFalcon Template By Vereor.